Spirtas Worldwide

Statement of Qualifications

An EJ Spirtas Company

Industrial expertise.
Across the asset lifecycle.

U.S. field execution. Seasoned international operations. Property management with an owner’s perspective.

Explore our qualifications
Cranes and excavators dismantling an industrial facility
Engineering, execution and asset stewardship
Structural demolition · Full-scale remediation · Complete Risk Transfer™ · Industrial asset liquidation · Property acquisition and management

Founded in 2004

Engineering discipline. An owner’s perspective.

Spirtas Worldwide connects engineering, field execution and commercial judgment to control risk, address environmental conditions, recover value and prepare facilities for their next use.

Our work serves industrial owners, developers, governments, EPC firms and facility operators.

01 / Domestic

U.S. expertise. Proven in the field.

Engineering-led execution for major power assets, manufacturing facilities, contaminated sites and demanding urban assignments across the United States.

Chesterfield Mall

Chesterfield, Missouri

Chesterfield Mall

1.3 million square feet deconstructed. A 117-acre site prepared for its next chapter.

Project details

For The Staenberg Group, Spirtas recovered and recycled approximately 95% of the structure, including 80,000 cubic yards of concrete processed on site for reuse. Work preserved the Dillard’s and Macy’s anchor buildings and coordinated demolition beside active roads. Signage removal began in October 2024, followed by heavy demolition in December.

9Stories. One coordinated response.

Manitowoc, Wisconsin

Manitowoc transformer oil cleanup

A coordinated PCB response across nine stories of an industrial building.

Project details

For Manitowoc Development LLC at 1512 Washington Street, the team identified contamination after transformer scavenging, collected residual oil and affected debris, and selectively removed contaminated materials. Work with the owner and U.S. EPA integrated PPE, segregation, containment, labeling, transport documentation and disposal at an authorized facility.

Moss Landing Power Plant in Moss Landing, California

Moss Landing, California

Moss Landing Power Plant

Bidding, engineering, permitting, project management and selected demolition in support of the contracting entity awarded the demolition.

Project details

Facility owner: Vistra Power
November 2021 – March 2023

Scaffold installation, environmental abatement and site engineering required coastal and local agency, Cal-OSHA and union coordination. The project record includes $6.4 million of environmental remediation and two 230-foot roof-hung boilers.

Cahokia Terminal Power Plant in Sauget, Illinois

Sauget, Illinois

Cahokia Terminal Power Plant

Direct owner engagement for above-grade remediation and demolition, with engineering coordination for deteriorating structures.

Project details

Client: WATCO Companies, LLC
Project scope · 2024

Dismantlement sequencing was developed with Thornton Tomasetti. Scope included six 400-foot smokestacks, approximately 300,000 square feet of slabs, mezzanines and equipment, asbestos remediation and oil recovery. Interfaces included river and rail access, active transloading, and coal and cement operations.

ORMET Aluminum Facility in Hannibal, Ohio

Hannibal, Ohio

ORMET Aluminum Facility

Three million square feet of industrial demolition coordinated with redevelopment and extensive materials recovery.

Project details

Client: Hannibal Development LLC
February 2016 – December 2019

Scope included two 250-foot stacks, a 100-foot scrubber, a 150-foot carbon-processing structure and disposal of 12,000 tons of spent pot lining containing cyanide and fluoride. Reported scrap processing included 18 million pounds of aluminum, 5 million pounds of copper and 60,000 tons of steel. Environmental work included asbestos and universal waste remediation and protection of the Ohio River.

Big River Zinc Facility in Sauget, Illinois

Sauget, Illinois

Big River Zinc Facility

Demolition and remediation of a 150,000-square-foot industrial facility with integrated smelter and process structures.

Project details

Client: JIVA Resources
December 2018 – January 2022

Scope included smelter reactors, a filter-press structure, a raw-material feed hopper and cell rooms. Phase I and II environmental assessments, asbestos and universal waste removal, soil contamination and wastewater management informed execution. Controls addressed heavy metals, hot work, working at height, rigging and regulated below-grade activity.

KU Jayhawk Stadium in Lawrence, Kansas

Lawrence, Kansas

KU Jayhawk Stadium

Accelerated winter demolition and excavation, delivered on time and under budget.

Project details

Client: Turner Construction – KU
December 2023 – January 2024

Around-the-clock holiday work released areas for new pier construction and stadium components. Two ultra-high-reach excavators, twelve multipurpose heavy excavators and a 50-person crew supported removal of light towers, stadia, the 150-foot press box and facility strip-out.

General Motors Leeds Facility in Kansas City, Missouri

Kansas City, Missouri

General Motors Leeds Facility

Structural and site demolition at a 2,517,000-square-foot facility, with asset liquidation and protection of active tenant areas.

Project details

Client: Stonemont Financial Group
March 2022 – March 2023

Planning addressed a 40-acre site, utility cuts, plumbing-loop reconfiguration, site security, asbestos and lead abatement, universal waste remediation and hot-work fire watch. Slab control, restoration and post-demolition barriers supported the site’s transition.

Selective demolition and urban sites

Protecting retained structures, surrounding streets and continuing operations.

Vanderbilt Medical Center · Oxford HouseNashville, Tennessee · Robins & Morton

A 12-story post-tensioned structure removed beside an operating hospital, using a Doka protective exoskeleton and Brokk demolition robots. Engineering, seismic monitoring and floor-by-floor sequencing protected neighboring buildings and patient access. Delivered 2.5 months ahead of schedule with zero accidents, injuries or near misses; all concrete, steel and post-tension tendons were recycled.

Madison Street parking garageJefferson City, Missouri · McCownGordon

Methodical top-down demolition of a multilevel garage in an active downtown corridor. Fenced containment, traffic coordination, daily debris removal and steel and rebar recycling supported safe execution. The site was cleared and leveled for a new garage, conference center and hotel development.

St. Louis Mills MallHazelwood, Missouri · Industrial Commercial Construction

Selective interior deconstruction of a 1.2-million-square-foot enclosed mall on a 145-acre site, preserving the structural shell for conversion to Hazelwood Business Park. Work removed retail and entertainment buildouts, finishes, fixtures and mechanical systems, with material segregation, recycling, dust containment and fire watch.

Teledyne manufacturing facilityToledo, Ohio · Industrial Realty Group

June to November 2021. Approximately 500,000 square feet of interior gut-out and 200,000 square feet of structural demolition. Work included mercury collection, asbestos and universal waste remediation, utility disconnects, confined spaces and critical fire watch.

Brown and Williamson facilityMacon, Georgia · Industrial Realty Group

Interior gutting, selective structural and outbuilding demolition, asset liquidation and scrap-sharing arrangements. Removal of rooftop mechanical equipment and boiler-room stacks required rigging, hot-work controls and protection of retained roofs.

Former Gannett printing facilityReno, Nevada · Industrial Realty Group

February 2021 to April 2022. Interior gutting, elevated mezzanine removal, selective demolition and asset liquidation. Utility rerouting, roof protection, dust and noise controls supported work beside active tenants.

Former GM assembly plantMoraine, Ohio · Industrial Commercial

Interior gut-out, elevated mezzanine removal, selective structural demolition and equipment salvage. Scope included 140 rooftop mechanical units, utility rerouting, refrigerant recovery, remaining-column engineering and roof protection.

Board of Education BuildingKansas City, Missouri · Copaken Brooks

The downtown assignment included 260,000 square feet of structural demolition, below-grade foundation removal, engineered fill, asbestos abatement and universal waste remediation. Controls included street and pedestrian rerouting, utility disconnections, air-quality permitting, dust and noise controls. Selective sawcutting preserved designated art-mural elements.

Barney Allis Plaza garageKansas City · Engineering and preparation, Fall 2026

Engineering and preparation for demolition of a three-story below-grade garage in downtown Kansas City. More than 24 months of planning address perimeter tiebacks, soil nailing, dense utilities, neighboring structures and active public rights-of-way. The Fall 2026 SOQ describes this assignment as being prepared for execution.

02 / International

An experienced international operator.

Active power corridors, operating ports, sophisticated process plants and cross-border asset relocation.

Process equipment and storage vessels at the CHOREN facility in Freiberg

Germany

CHOREN biomass gasification

Freiberg · Industrial asset transition

Plant acquisition, industrial asset evaluation, decommissioning, equipment recovery and sale of assets and property following facility shutdown.

Explore the scope

The Beta gasification facility combined steam-turbine generation, transformers, switchgear and emergency generation with nitrogen and hydrogen compression, pumps, chillers, heat exchangers and cooling towers. Environmental and site interfaces included wastewater, cold-water, fire protection, thermal-gas flare systems, tank farms and redevelopment considerations.

EuropeChina

Identify · Preserve · Relocate · Reuse

Europe to China

Quinn Chemicals plant relocation

Controlled dismantlement and reconstruction support

A complete process-system dismantlement for international relocation. Equipment was identified, match-marked, preserved, packaged and shipped to China for reconstruction and reuse.

20+Process columns
40+Heat exchangers
~160Pumps
Explore the scope

The facility also included reactors, tanks, drums, extensive valves and piping, and specialty-metal systems in stainless steel, duplex stainless steel, Hastelloy and zirconium. Boxing, crating, export preparation and container loading maintained equipment identity, followed by technical support for reassembly.

Spirtas representatives participating in discussions at SINOMA

China and Jamaica

Industrial advisory and collaboration

Design, energy, industrial facilities and logistics

Consulting and development engagements extend the company’s role into constructability, energy and utility considerations, decommissioning strategy, ports and infrastructure planning.

Explore the scope
  • Geo Harbor: Evaluation of like-kind energy and power facilities in U.S. regions.
  • SINOMA and Noranda Aluminum: Work in Beijing and Jamaica to facilitate acquisition, demolition and reconstruction of a specialized plant.
  • CYENER Mechanical Systems: Collaboration on a U.S.-based HVAC mechanical cooling system.
  • CNOOC Oil and Gas: Collaboration on energy-field evaluation in China and other countries.

These are advisory and development engagements, distinct from the field execution projects presented here.

Site teams coordinating in La Guaira, Venezuela

Venezuela

Emergency response and coordination

La Guaira and Caracas

Emergency response and coordination of demolition services, rescue-response services and infrastructure contracting support.

Explore the scope

The assignment extends Spirtas Worldwide’s international experience into emergency conditions, where demolition and infrastructure work are coordinated with response activities and local stakeholders.

03 / Property management

Manage the asset. Prepare its next use.

An owner’s perspective on industrial and commercial property, connecting facility operations, recoverable assets and redevelopment.

Property management is part of Spirtas Worldwide’s operating platform. The company assembled a private industrial and commercial property portfolio and developed property-management, facility-operation and asset-liquidation services to support its properties and clients.

$60M+

Industrial properties purchased

Industrial property acquisition value reported in our Fall 2026 qualifications.

Property & facility operations

Coordinate property services and facility operations around the asset’s intended use.

Financial oversight

Connect job costing, vendor payments, insurance coordination and performance review with property services.

Asset recovery & disposition

Evaluate equipment and infrastructure for reuse, private sale or liquidation.

Redevelopment readiness

Address environmental conditions, preserve useful infrastructure and prepare sites for their next use.

Industrial and commercial property portfolio

Industrial sites, redevelopment land and commercial space featured in our Fall 2026 qualifications. Contact our property team for leasing, investment and current availability.

Corporate Lake

St. Louis, Missouri

Corporate Lake

Office, laboratory and technology campus

12.87 acres · 125,811 SF · 6 buildings · 622 parking spaces

Canton

North Carolina

Canton

Former paper mill

185 acres

Sherman Station

Maine

Sherman Station

Industrial warehouse

11.4 acres

Hannibal

Ohio

Hannibal

Wastewater treatment plant

1,600-acre site

Lee

Massachusetts

Lee

Industrial warehouse

5.7 acres

Kansas City

Kansas

Kansas City

Land development

18.29 acres

Oswego

New York

Oswego

Land development

31 acres

Memphis

Tennessee

Memphis

Industrial space

1.5 acres

Niagara

Wisconsin

Niagara

Industrial space

0.6 acres

Property inquiries

John DeKraker · Leasing and investment

john.dekraker@spirtasworldwide.com

Property management team

39 North Properties: Holly Tang, Property Manager; Li Cheng, General Manager.

Acquisition and redevelopment experience

Selected assignments show acquisition, disposition and site-transition capabilities. The redevelopment projects below are identified by their actual scope.

CHOREN · Freiberg, Germany

Historical acquisition & asset disposition

CHOREN · Freiberg, Germany

The seven-acre former gasification plant combined equipment, infrastructure and real estate in a complete-plant or component-sale strategy following shutdown in 2011.

Assignment context

The historical brochures identify the purchase by FAM Germany in conjunction with Niagara Worldwide and name Eric Spirtas as Niagara’s president. The current Spirtas qualification record includes CHOREN acquisition, decommissioning, recovery and property disposition experience.

General Motors Leeds · Missouri

Tenant protection & site transition

General Motors Leeds · Missouri

At the 2,517,000-square-foot facility, asset liquidation, utility coordination, restoration and protection of active tenant areas supported the property’s transition.

Assignment context

Client: Stonemont Financial Group. March 2022–March 2023. This is a demolition and redevelopment-support assignment, not a claim of ongoing property management.

ORMET · Hannibal, Ohio

Industrial redevelopment & recovery

ORMET · Hannibal, Ohio

Three million square feet of demolition were coordinated with redevelopment and extensive recovery of aluminum, copper and steel, with environmental controls protecting the adjacent Ohio River.

Assignment context

Client: Hannibal Development LLC. February 2016–December 2019. The documented scope is demolition, environmental work and recovery supporting redevelopment.

Oversight that connects operations and value

CFO Kevin Cheung oversees property-management services alongside construction accounting, job costing, vendor payments, insurance coordination and performance analysis.

Discuss a property assignment

04 / Integrated capabilities

One coordinated
industrial scope.

From investigation and engineering through decommissioning, recovery, relocation and redevelopment.

01

Engineering and planning

Demolition surveys, structural separation, sequencing, temporary works and critical-lift planning. The engineering establishes how to dismantle the asset and protect what stays.

02

Demolition and decommissioning

Industrial, structural and mechanical demolition. Selective dismantlement, high-reach operations, controlled cutting and substructure removal where included in scope.

03

Environmental remediation

Asbestos, PCBs, petroleum, chemicals, universal waste and contaminated materials. Characterization, abatement, handling and disposition coordinated with field execution.

04

Asset recovery and liquidation

Process equipment, machinery and metals evaluated for reuse, salvage, recycling, liquidation or private sale. Recoverable value is integrated into the commercial plan.

05

Logistics and plant relocation

Rigging, match-marking, preservation, export preparation and containerization. International shipment coordination and technical support for reconstruction.

06

Property and redevelopment

Industrial acquisition, site stabilization, infrastructure preservation, facility conversion and property repositioning, supported by property management and facility operations.

Control the work.
Protect what surrounds it.

When engaged as prime contractor, Spirtas provides engineering coordination, safety leadership, project controls and operational accountability for the agreed scope. Planning addresses structural condition, environmental hazards, critical lifts, hot work, active utilities and the operations that must continue nearby.

05 / Leadership and delivery

Experienced direction.
Clear accountability.

Executive, engineering, financial and field experience connected to each assignment.

Eric J. Spirtas

Eric J. Spirtas

President and Chief Executive Officer

Established Spirtas Worldwide in 2004, connecting industrial demolition and remediation with property acquisition, asset liquidation, facility operations and redevelopment.

Kevin Cheung

Kevin Cheung

Chief Financial Officer

Financial leadership spanning project setup, job costing, vendor payments, insurance coordination, performance analysis and property management.

Rommel Medrano

Rommel Medrano

Chief Operating Officer

More than 25 years of leadership in operations, growth and cross-functional teams, supporting U.S. and international activities in Aruba and Trinidad and Tobago.

Jim Moriarity PE

Jim Moriarity PE

Vice President and Director of Engineering

Engineering, estimating and project-management leadership supporting scope development, critical analysis, safety interfaces and execution planning.

Eric Sutton

Vice President of Business Development

Leslie Pichery

Director of Health and Safety

Connor Spirtas

Director of Business Operations

Craig Segelke

Director of Emergency Response

The international delivery model

Self performance.
Local execution.

Spirtas combines executive, engineering, safety and specialty demolition leadership with qualified regional labor, equipment, suppliers and contractors.

Resources matched to the work

High-reach and heavy excavators, specialized attachments, cranes, loaders and material-handling equipment support critical field scopes. Owned resources are supplemented by leased equipment and rental capacity.

Jurisdiction-specific planning

Licensing, permits, customs, tax, insurance and local requirements are addressed with qualified regional legal, financial, engineering and contracting partners where required.

Commercial responsibility

Our Complete Risk Transfer™ offering coordinates demolition, environmental work, asset recovery and property considerations. Scope, insurance, bonding and allocation of risk are established for each assignment.

Coordinated support

Project executives, engineers, estimators, superintendents and safety specialists work with environmental, legal, accounting, insurance and property-management professionals.

People, safety and resources

Built to mobilize. Equipped to deliver.

100+ years of combined executive experience and 200+ years of combined field knowledge, supported by 10 satellite offices and international offices in Trinidad and Tobago and Aruba.

$70MIndustrial demolition revenue
$30M+Asset liquidation
0.71Experience modification rate (EMR)
$50M+Bonding capacity
15On-staff engineers
4Full-time safety engineers
50+Full-time employees
300+Contracted personnel annually

Company figures reported in the Fall 2026 Statement of Qualifications.

24/7 emergency response

Response to fire, water, mold, biohazard and storm damage, coordinated with remediation, structural work and recovery.

+1 855 591 1555

Equipment and field capacity

2 specialized, 21 standard and 7 mini excavators; 5 cranes rated 45–70 tons; 7 loaders; 12 manlifts; and 16 skid steers. Project teams combine engineering, HSSEQ, supervision, coordination and equipment operation.

Insurance and risk support

Coverage listed in our insurance schedule: $2M base general liability, $1M U.S. auto, $10M U.S. pollution, $10M U.S. excess and $50M excess liability. Certificates of insurance are available on request.

Professional network and industry affiliations

Legal and accounting

Aegis Law · Robert “Bo” Deverux; Gadsby Law · Hadyn-Jon Gadsby; UHY · Larry Jourdan.

Environmental and insurance

Geo Resources · Bob Fargo. Marsh · Thomas Swartz, J. Foster and Chuck (Charles) Swartz.

Industry affiliations

Affiliations shown in our company qualifications: ISRI, SIOR, Associated General Contractors of America and National Demolition Association.

Qualifications library

The experience, in detail.

Start a conversation

What comes next
for your industrial asset?

Discuss your assignment with Spirtas Worldwide.

Contact Eric Spirtas Download the Statement of Qualifications PDF in English · 28 pages · 22.2 MB

Spirtas Worldwide

10167 Corporate Square Drive
St. Louis, Missouri 63132 USA
+1 855 591 1555spirtasworldwide.com